BO Types Filter
30.09.2026
Strong and Guaranteed Quality 304 Stainless Steel ...
30.09.2026
PPGI PPGL Color Coated Galvanized Galvalume Steel ...
30.09.2026
Smooth SPCC DC01 DC02 Cold Rolled Steel Coil Surfa...
30.09.2026
Flat bar AR400 Wear Resistant Metal Sheets AR500 B...
28.09.2026
ASTM A36 Hot Rolled Carbon Steel Plate 2mm 10mm MS...
25.09.2026
SAE 1008 1015 1018 3mm 5mm 8mm Hot Rolled Cold Rol...
25.09.2026
H Shape Structural Steel Sheet Q235B Q345B Hot Rol...
25.09.2026
China Top Factory Supply Hot Sales ASTM A36 S235 S...
25.09.2026
H-Shaped Steel/Carbon Steel Pipe/Seamless Steel Pi...
25.09.2026
Astm A36 S235jr Q690 Mild HR Plate MS Sheet 1mm-20...
Battery Metals, Steel & Metal
- Austria -

MRC in Advanced Talks for Complete Ownership of WA Graphite Project

According to chemanalyst, Mineral Commodities Ltd ("MRC") (ASX:MRC) announced that its wholly-owned subsidiary, MRC Graphite Pty Ltd ("MRCG"), is engaged in good faith negotiations with its joint venture partner, Gold Terrace Pty Ltd ("Gold Terrace"), to reach a commercial settlement regarding MRCG's right to acquire a 90% interest in the Munglinup Graphite Project ("Munglinup").

MRC plans to postpone fulfilling its Earn-in Obligation to provide time for a settlement that would enable MRCG to increase its stake in Munglinup from 51% to 100%. MRCG currently holds a 51% interest in the project under a Joint Venture Agreement with Gold Terrace, who holds the remaining 49%.

According to the Agreement, MRCG can increase its interest from 51% to 90% by completing a Feasibility Study, paying Gold Terrace A$800,000, and issuing 30 million MRC shares. While MRCG asserts it has fulfilled the relevant Earn-in Obligations, Gold Terrace disputes MRCG's right to increase its stake, arguing the Feasibility Study did not meet requirements.

The parties have held meetings to resolve the dispute, and progress has been made in good faith negotiations, which remain ongoing and confidential. If an agreement is successfully executed, it is likely to result in the dispute being resolved and MRCG owning 100% of the Munglinup Project.

To provide time for a potential agreement and obtain regulatory approval, MRC has informed Gold Terrace of a revised completion date of July 6, 2024, to fulfill its Earn-in Obligations.

Iron ore futures extend gains as China outlines stricter steel capacity controls

Baosteel Q3 net profit jumps 130% on demand recovery and resilient exports

LME proposes permanent curbs on large nearby positions amid depleted stocks, zinc squeeze

China lifts curbs on Hancock Prospecting’s MB fines purchases, easing iron ore trade friction

China’s CISA mills lift early‑October crude steel output 7.5%; inventories also climb

India’s steelmakers seek relief from import curbs as H1 met coke shortfall widens

China iron ore futures slip; Tangshan concentrate prices steady amid tight supply

Indonesia suspends all scrap metal imports after radioactive contamination detected

Serbia asks EU to exempt it from proposed new steel tariffs and quota cuts

U.S. judge signals approval of Rio Tinto’s $138.75 million Oyu Tolgoi investor settlement

Rio Tinto says strong Q4 needed to hit iron‑ore target after Q3 shipments of 84.3 mt; China demand firm

ArcelorMittal’s M&A chief in South Africa for talks on sale of local unit, sources say

EU plan to halve steel import quotas and double out‑of‑quota tariff to 50% raises Indian export risk

Copper tops $11,000/t on LME as supply disruptions and fund buying lift prices